top of page
Search
Isobelle Edmondson
Feb 20, 20233 min read
UK Residents Urged to Properly Recycle Lithium Batteries
Rapid-fire intervention from site staff is vitally important as part of the mitigation process. We can train your organisations onsite team.
Isobelle Edmondson
Oct 6, 20224 min read
Air Products Consultancy and Rescue Team Provision
HFR Solutions carried out a work at height exercise from the top of the Cold Box structure.
Isobelle Edmondson
Aug 11, 20221 min read
Personal Protective Equipment at Work
PPE will be used to prevent or adequately control the risk or risks involved without increasing the overall risk.
Isobelle Edmondson
Jul 7, 20223 min read
Palace of Westminster Consultancy Project
HFR Solutions were contacted to work collaboratively with Shepley on a large scale roof renovation project at the Palace of Westminster.
bottom of page